December 1998
Industry At A Glance
98-12_tech_concentric-fig1.html (Dec-1998)
A monthly magazine offering industry news, statistics and technical editorial to the oil and gas drilling, exploration and production industry.
Fig. 1. Installation of the downhole injection system can be made in an average 3 hr, without need for a rig and without interruption to a flowing well. |
||
Copyright © 1999 World Oil
Copyright © 1999 Gulf Publishing Company