June 1998
Industry At A Glance
98-06_technology_figp3.html (Jun-1998)
A monthly magazine offering industry news, statistics and technical editorial to the oil and gas drilling, exploration and production industry.
Fig. 3. End of pipeline after short stainless section is welded on, and PE liner and compression ring seal are installed (A). Stainless sections are then welded together to complete the pipeline connection (B). |
|
Copyright © 1999 World Oil
Copyright © 1999 Gulf Publishing Company