November 1998
Industry At A Glance
98-11_using4d-waite_fig8.html (Nov-1998)
A monthly magazine offering industry news, statistics and technical editorial to the oil and gas drilling, exploration and production industry.
Fig. 8. Maps of steam thickness in the three Duri pilot reservoir intervals after 31 months of steam injection. The Lower Pertama interval has the largest sweep efficiency. Steam thickness from the observation wells is posted on each of the maps. |
|
Copyright © 1999 World Oil
Copyright © 1999 Gulf Publishing Company