Issue: August 2024
Features
When integrated as part of a cross-functional solution encompassing the downhole tool design, chemical delivery method, and automated gas injection rate controls, chemical packages qualified for the job at hand can help operators get the most out of their wells while ensuring long-term gas lift system operation.
SPECIAL FOCUS: Offshore operations
A new multi-zone single trip system with an integrated barrier valve offers a comprehensive solution for offshore deepwater and ultra-deepwater sand-control completion needs.