In its application, operator Exxon Mobil refers to current estimates, which indicate production until the end of 2022.

Sigyn’s subsea facilities comprise wells and a subsea template, a pipeline to Sleipner A, as well as an umbilical for controlling and monitoring of wells.

A new development well was drilled at Sigyn in 2016, which has contributed to the extended lifetime. The Sigyn field encompasses the deposits Sigyn Vest, which contains gas and condensate, and Sigyn Øst, which contains light oil. The field was developed with a subsea template connected to the Sleipner Øst platform. Production started in 2002. 

Original oil deposits amounted to 1.2 MMscm (7.5 MMbbl). Remaining oil to produce is estimated at 0.9 MMscm (5.6 MMbbl). Out of the original gas reserves of 8 MMcsm, about 1 million remains to produce.

The licensees in Sigyn are Exxon Mobil with 40% and Statoil with 60%.