BiSN deploys largest-ever bismuth plug

October 22, 2018
null
Valhall field. Photo: AkerBP.

HOUSTON -- BiSN, the global leader in metal-to-metal downhole sealing solutions, has achieved a world first in conjunction with AkerBP and Altus Intervention, through the successful deployment of the largest-ever bismuth plug.

Following over a year of development, BiSN’s award-winning Wel-lok M2M technology - which can be utilized during well and rigless well abandonment – was deployed via E-line in collaboration with Altus Intervention in AkerBP’s Valhall A-30 well in the Norwegian North Sea.

The Wel-lok M2M technology aims to bring substantial savings to operators by eliminating rig costs and doing the work rigless.

Conducted as a field trial, the tool was set to evaluate the effectiveness of bismuth as a permanent seal for P&A operations in lieu of cement. With 3,500 kg of bismuth alloy, a gas tight surface seal was created inside 18 5/8-in. casing through a section milled window cut in the 13 3/8-in. casing, entering previously unchartered territory regarding weight, size and precise setting procedures.

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.