Australia
News
December 24, 2024
Falcon Oil & Gas Ltd. has announced that the Shenandoah S2-4H horizontal well was successfully drilled, cased and cemented to a measured depth of 6,452 meters (21,169 feet) in exploration permit 98 in the Beetaloo Sub-basin.
News
December 03, 2024
Trendsetter Vulcan Offshore (TVO) has appointed Russell Collins as Country Manager, Australia, to head up the company’s newly opened office in Perth.
News
November 25, 2024
Falcon Oil & Gas Ltd. has announced the spudding of the Shenandoah S2-4H horizontal well (previously referred to as the SS3H well) in exploration permit 98 in the Beetaloo Sub-basin, Northern Territory, Australia.
News
October 14, 2024
Woodside Energy has announced the successful completion of the installation of the Scarborough Energy Project trunkline which will transport offshore gas to the onshore Pluto LNG processing facility in Karratha.
News
September 10, 2024
C-5H will be operator Empire Energy’s longest drilled and stimulated horizontal shale well and will target a ~3,000 m horizontal section and ~60 fracture stimulation stages. C-5H will integrate the best completion practices from North American shale analogues and incorporate learnings from Carpentaria-2H and Carpentaria-3H.
News
September 04, 2024
Under a contract awarded to McDermott in January 2024 by Santos, the company provided engineering, procurement, removal, and transportation of the platform topsides, substructure, and associated items to an onshore facility for dismantling and disposal.
News
August 21, 2024
Sentinel Subsea was selected by a major client to support the decommissioning of subsea assets in collaboration with Baker Hughes. This project successfully deployed two WellSentinel Coral systems that enable the continuous monitoring of temporary suspended wells in the remote field.
News
August 19, 2024
The Scarborough Energy Project has all primary environmental approvals in place, and offshore work is progressing well. The Federal Court proceedings sought an injunction to stop offshore activities for the Scarborough Energy Project. The parties have agreed to seek orders from the Court to dismiss the proceedings.
News
August 14, 2024
As Australia shifts towards renewable energy, optimizing existing gas production fields remains crucial to meeting rising global energy demands.
News
August 13, 2024
Construction on SGP North is scheduled to begin later this year, with infrastructure to include up to 450 new gas production wells, a new field compression station, 27km of pipeline, and road and infrastructure upgrades over two phases.
News
August 05, 2024
ASCO mobilized two radiation safety officers (RSOs) as well as NORM (Naturally Occurring Radioactive Material) and mercury monitoring and analysis equipment to the OMSB site. The RSOs delivered on-site training for NORM awareness, and monitoring for various hazards such as benzene, H2S (hydrogen sulphide) with a particular focus on NORM and mercury.
News
July 15, 2024
Wood has secured a six-year contract to provide brownfield engineering, procurement, and construction management (EPCm) solutions for Shell’s Prelude Floating Liquified Natural Gas (FLNG) facility in Western Australia.
News
June 30, 2024
Under the multi-year services frame agreement, Baker Hughes will provide spare parts and field service resources for onsite turbomachinery equipment maintenance and upgrades, equipment refurbishment and advanced digital asset performance services.
News
May 30, 2024
The loan for the Scarborough project, which is scheduled to deliver its first LNG shipment in 2026, will come from the Japan Bank for International Cooperation. The public financial institution has stepped-up efforts to secure LNG, including granting loans for fuel purchases.
News
May 09, 2024
The government released a long-term framework, called the Future Gas Strategy, on Thursday to establish natural gas’s role in the transition to cleaner energy, as it looks to meet a target for net zero by 2050.
News
May 01, 2024
The SABER Tool, based on a concept originally designed by Shell, deploys a unique internally directed fluid pressure differential system for steering rather than using pads or pistons. B
News
April 11, 2024
Both Macedon and Pyrenees will remain within the Australian operations portfolio and focus on maintaining safety and production performance. Both assets help ensure energy security and reliability of natural gas supplies in Western Australia.
News
March 26, 2024
The SS-1H well in EP117 achieved an average 60-day initial production (IP60) flow rate of 3 MMcfd over the 1,644-foot (501 m), 10 stage stimulated length within the Amungee Member B-Shale, normalized to 6 MMcfd over 3,281-ft (1,000 m).
News
February 13, 2024
Investors have been looking for clues on Woodside’s next move after talks to create a A$86 billion ($56 billion) company with Santos ended. Santos’s portfolio would have made Woodside one of the biggest LNG producers in the Asia-Pacific, but executives warned any deal would need to reflect low premiums in recent oil and gas transactions.
News
February 07, 2024
Woodside Energy Group Ltd. and Santos Ltd. have ended tie-up talks that would have created an Australian gas export powerhouse, leaving the smaller Adelaide-based producer under pressure to consider asset sales and other options to boost its lagging valuation.
News
February 05, 2024
Australia’s oil and gas industry has called on the government to use the Federal Budget to urgently unlock new gas supply to avoid forecast shortages, put downward pressure on prices and secure the economic and emissions reduction benefits of the country's abundant natural gas resources.