News
May 20, 2024
ADNOC has acquired an 11.7% stake in Phase 1 of NextDecade Corporation’s Rio Grande LNG in Texas, United States. The project is expected to produce a less carbon-intensive LNG. Additionally, ADNOC and NextDecade have entered into a 20-year LNG offtake agreement from RGLNG Train 4.
News
May 15, 2024
Developed by Italy’s Eni, the project delivered its first LNG cargo this year and has laid the foundation for new investments in Congolese gas.
News
May 13, 2024
TechnipFMC will design, manufacture, and install the subsea production system, flexible pipe, and umbilicals for the Xena Infill well (XNA03) to support ongoing production from the Pluto LNG Project. The award follows an integrated front end engineering design (iFEED™) study.
News
May 08, 2024
The Ruwais LNG plant is set to be the first LNG export facility in the Middle East and Africa region to run on clean power and will leverage the latest technologies and artificial intelligence (AI) tools to minimize emissions and drive efficiency.
News
May 06, 2024
The company expects to make additional investments in the proposed Commonwealth LNG project in Louisiana. Kimmeridge is also open to deals with other U.S. LNG export projects.
News
May 05, 2024
The discussions involve liquefied gas to be produced at Tellurian’s proposed Driftwood LNG project in Louisiana and NextDecade’s Rio Grande terminal in Texas, said the people, who asked not to be named discussing non-public information.
News
May 02, 2024
Commissioner Christian denounced President Biden's actions as election year politics, asserting that the pause on LNG exports would neither reduce emissions nor benefit allies, instead making energy more expensive and less accessible.
News
April 24, 2024
The contract covers Engineering, Procurement and Construction (EPC) of a natural gas liquefaction train with an LNG production capacity of 1 MMtpa.
News
April 24, 2024
Texas LNG Brownsville LLC and a subsidiary of Glenfarne Energy Transition, LLC, has signed a second Heads of Agreement (HOA) with EQT Corporation for natural gas liquefaction services for an additional 1.5 MMtpa of LNG over 20 years.
News
April 23, 2024
The Ruwais project, which is currently fully owned by Adnoc, will have the capacity to export 9.6 million tons of LNG per year, more than doubling the UAE’s total output
News
April 22, 2024
The Marsa LNG project combines upstream gas production of 150 MMcfd with a 1 MMtpa capacity LNG liquefaction plant and a dedicated 300 MWp PV solar plant, positioning the site as one of the lowest GHG emissions intensity LNG plants ever built worldwide, with a GHG intensity below 3 kg CO2e/boe.
News
April 17, 2024
In the Short-Term Energy Outlook (STEO), the U.S. Energy Information Administration (EIA) forecasted that U.S. liquefied natural gas (LNG) exports will keep leading the U.S. natural gas sector as three LNG export projects soon begin operations and reach full production by the end of 2025.
News
April 08, 2024
Jamie Dimon said U.S. delays of liquefied natural gas (LNG) projects were done for “political reasons” to pacify those who believe oil and gas projects should be stopped — a position he calls “wrong” and “enormously naïve.”
News
April 08, 2024
Baker Hughes will supply a range of turbomachinery equipment, including four electric-driven main refrigeration compressors, two electric-driven boil-off gas compressors and six centrifugal pumps.
News
April 04, 2024
Johnson, speaking in an Easter interview on Fox News Sunday, hinted that he planned to bring a Ukraine aid package that could include language reversing the permitting pause to the floor after the House returns from its spring recess April 9.
News
March 31, 2024
The 19 conventional LNG vessels have a capacity of 174,000 m3 each and will be equipped with the latest LNG shipping technologies to achieve optimal fuel efficiency and reduce carbon emissions.
News
March 26, 2024
The Scarborough field is located approximately 375 km off the coast of Western Australia and the reservoir contains less than 0.1% carbon dioxide. Scarborough gas will be processed at the Pluto LNG facility, where Woodside is currently constructing Pluto Train 2. Woodside is operator of Pluto LNG and Pluto Train 2.
News
March 21, 2024
A lawsuit filed against President Joe Biden and the U.S. Department of Energy in Louisiana federal court on Thursday asks a judge to overturn the temporary pause. The action supported by 16 state attorneys general, argues the administration runs counter to Congressional intent and decades of policy.
News
March 20, 2024
Maintenance will increase the Texas facility’s capacity to 16.5 million metric tons a year, up from the approximately 15 million tons a year currently, CEO Michael S. Smith said Tuesday at the CERAWeek by S&P Global energy conference in Houston.
News
March 19, 2024
ADNOC announced the signing of a 15-year Heads of Agreement (LNG agreement) with SEFE Marketing & Trading Singapore Pte Ltd., a subsidiary of Germany’s SEFE Securing Energy for Europe GmbH, for the delivery of 1 million metric tonnes per annum (MMtpa) of liquefied natural gas (LNG).
News
March 19, 2024
The report, conducted by Energy Ventures Analysis, demonstrates the American natural gas industry’s record of supporting allies abroad while maintaining a well-supplied domestic market at home.
Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.