Australasia
News
August 11, 2015
Karoon Gas Australia has announced that the Levitt-1 exploration well in WA-482-P Carnarvon basin, offshore Western Australia encountered no hydrocarbons.
News
July 31, 2015
InterOil Corp. and Total E&P PNG Limited have agreed that Total will become operator of Petroleum Retention License 15 in the Gulf Province of Papua New Guinea from August 1, 2015.
News
July 30, 2015
Wood Group has secured a new contract to carry out front-end engineering and design (FEED) for the Woodside operated proposed Browse Floating Liquefied Natural Gas (FLNG) Development, offshore Western Australia.
News
July 19, 2015
MELBOURNE -- Air and sea surveillance found no trace of oil sheen or patches near Australia’s Great Barrier Reef after a reported sighting by fisherman on Friday.
News
July 16, 2015
Woodside Petroleum Ltd.’s sales fell by almost half in the second quarter amid falling energy prices and lower output of LNG.
News
July 13, 2015
BG Group has started up and loaded its first LNG from the second production train at the Queensland Curtis LNG (QCLNG) facility in Australia.
News
July 08, 2015
Global Maritime Deep Sea Mooring has been awarded a contract for the provision of mooring and rig positioning services to the Australian oil and gas company Woodside.
News
July 08, 2015
Subsea 7 has been awarded four contracts, by Chevron Australia Pty Ltd and INPEX Operations Australia Pty Ltd, for the engineering, procurement and construction of an emergency pipeline repair system (EPRS) to be used offshore Australia.
News
July 06, 2015
Woodside Energy and OneSubsea, a Cameron and Schlumberger company, announced Monday that OneSubsea has been awarded a front-end engineering and design (FEED) contract for the proposed Woodside-operated Browse FLNG Development offshore northwest Australia.
News
July 06, 2015
Karoon Gas Australia has commenced the high impact Levitt-1 exploration well in WA-482-P Carnarvon basin, offshore Western Australia.
News
July 06, 2015
Drydocks World has marked a major milestone in successfully completing the world’s largest turret mooring system at Shell's Prelude FLNG off Australia.
News
July 03, 2015
Videocon Industries Ltd., an Indian maker of consumer electronics with ambitions to become a major energy producer, plans to invest as much as $2.5 billion over three years in Brazilian oilfields, Chairman Venugopal Dhoot said.
News
July 02, 2015
InterOil Corporation and the PRL 15 joint venture participants have unanimously endorsed recommendations from Total SA for key project infrastructure sites for development of Elk-Antelope gas field in Papua New Guinea.
News
July 02, 2015
Global Maritime Deep Sea Mooring has been awarded a contract for the provision of mooring and rig positioning services to the Australian oil and gas company Quadrant Energy Ltd.
News
July 01, 2015
Woodside, as a participant in the Browse FLNG Development, advised Wednesday that an agreement has been reached to enter the front-end engineering and design (FEED) phase for the proposed development.
News
July 01, 2015
Wood Group has secured a $1-million contract with Origin Energy to provide detailed design engineering for the onshore pipelines related to the Halladale, Black Watch & Speculant (HBWS) Natural Gas Project in South West Victoria, Australia.
News
June 29, 2015
Origin Energy Ltd. expects China Petrochemical Corp. to fulfill its agreement to purchase liquefied natural gas from a A$24.7 billion ($19 billion) export project in Australia.
News
June 25, 2015
Woodside has received retention lease renewal offers for petroleum retention leases WA-28-R, WA-29-R, WA-30-R, WA-31-R, WA-32-R, TR/5 and R2, from the Commonwealth-Western Australia Offshore Petroleum Joint Authority and the WA Minister for Mines and Petroleum. Woodside has 30 days to accept the retention lease renewal offers.
News
June 22, 2015
TGS has announced its participation in the 2,500 km2 Monuments 3D survey.
News
June 12, 2015
Chevron is studying data from its largest-ever seismic survey to decide where to drill for oil in an untapped frontier off southern Australia.
News
June 10, 2015
An equipment failure that’s delayed Chevron Corp.’s $5.1 billion Big Foot deepwater oil project will reduce the company’s production target by less than 25,000 bopd in 2017, the company said.


