HPHT

Whitepaper

Finding a Better Lining for Free Water Knockout Vessels

July 13, 2023
Sherwin Williams
News
June 15, 2023
The company will tie back four subsea gas wells in the Carnarvon basin to the existing Julimar subsea infrastructure producing to the Wheatstone platform, using high pressure, high temperature (HPHT) flexible pipe and steel tube umbilicals.
News
January 12, 2023
Trendsetter’s awarded scope includes a multi‐year rental and servicing agreement for the provision of a 20,000 psi Subsea Well Intervention package with anticipated delivery of the system scheduled for Q3‐ 2023.  This award follows previously awarded scopes for the initial design and qualification of the system.
News
July 28, 2022
Aquaterra Energy has been awarded a high-pressure high temperature subsea riser contract with oil and gas operator, Umid Babek Operating Company (UBOC), for the exploration of its HP well on the Babek project in Azerbaijan.
News
June 27, 2022
BiSN, a supplier of sealing solutions and technology to the global oil and gas industry, announced that it has completed its 300th deployment, helping operators around the world to effectively solve common downhole flow issues.
News
May 03, 2022
TechnipFMC has been awarded an additional contract and received notice to proceed by ExxonMobil affiliate Esso Exploration and Production Guyana Limited for its Yellowtail development in the Stabroek Block offshore Guyana.
Article
October 2021
High temperatures, high pressures and/or abrasive formations can make for unmanageable conditions. A proprietary MWD technology has been developed to endure harsher downhole environments than previous measurement logging tools.
News
January 28, 2021
Neptune Energy and its joint venture partners bp and JAPEX, announced drilling has commenced on the Seagull project in the UK Central North Sea.
Article
January 2021
In the developing world of offshore drilling in the U.S. Gulf of Mexico, leaders in well control containment technology must be innovative to keep pace with drillers in the region.
News
December 12, 2019
The equipment that will be deployed in the Anchor project is covered under the 20-year subsea equipment and services master order for Chevron’s development projects in the Gulf of Mexico.
News
November 21, 2019
The increased capability of the XSTMZ system helps increase production and total recovery by driving down abandonment pressure and can save rig time by isolating and treating several intervals with a single trip.
Article
August 2019
Completion system capabilities continue to advance, as the industry targets deeper formations in developing unconventional plays.
Article
August 2019
As operators search for reserves in challenging HPHT environments, new technology is required to support these projects. An innovative expandable liner hanger, which offers a gas-tight metal-to-metal sealing system, is capable of superior hanging capacity for installing casing strings of various lengths.
News
July 30, 2019
Shell’s Appomattox project, located in the Gulf of Mexico about 80 miles south of New Orleans, is the first high temperature project to gain BSEE approval and begin production.
News
July 03, 2019
Kuwait Oil Company (KOC) and Halliburton have announced the companies have signed an integrated offshore drilling services contract for six high-pressure high-temperature (HPHT) exploration wells on two jackup rigs in the Arabian Gulf.
Article
June 2019
New valves and piping designs mitigate the detrimental effects of HPHT conditions and extreme pressure drops, as well as severe erosion and caustic environments.
News
May 14, 2019
The TenarisHydril Wedge 667 connection was designed for HP/HT and deep well applications.
News
April 22, 2019
Trelleborg Sealing Solutions announces the launch of the new XploR S-Seal and XploR FS-Seal that have been developed for demanding high pressure sealing environments, such as those found in oil and gas downhole tool applications.
Article
February 2019
To navigate continually changing HPHT design and regulatory requirements, a collaborative approach is required. The team is qualifying a 20,000-psi rated BOP. Engineers are hopeful that the HPHT design process will reach the same level of standardization as today’s 15,000-psi equipment, after completion of this and similar qualification efforts.
News
November 09, 2018
Recently, at World Oil’s HPHT Drilling, Completion and Production Conference, National Ocean Industries Association (NOIA) President Randall Luthi said in a keynote address that his Washington, D.C.-based lobbying group is committed to providing the oil and gas industry with reliable access to the nation’s government officials. He stressed that NOIA strives to ensure fair regulatory and economic environments for offshore operators.
News
August 28, 2018
Trelleborg Sealing Solutions has announced the launch of a new metal end cap seal specifically engineered for HTHP wellhead tubing and casing hanger sealing environments, which combines the pressure and extrusion resistance of a metal-to-metal bonded component with the flexibility of an elastomer.
Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.