Completion

News
October 15, 2025
Halliburton has secured multiple contracts from Petrobras to deliver completion, stimulation, and safety valve services across Brazil’s deepwater fields. The projects, starting in 2026, will deploy Halliburton’s SmartWell® and EcoStar® technologies.

News
September 25, 2025
SLB has secured a major Petrobras contract for up to 35 ultra-deepwater wells in Brazil’s Santos Basin Atapu and Sépia fields, deploying advanced electric completions and digital technologies to enhance production and reservoir management.

News
September 11, 2025
Baker Hughes has secured a major award from Turkish Petroleum (TPAO) and TP-OTC to deliver subsea production systems and intelligent completions for the Sakarya Gas Field Phase 3 in the Black Sea, enhancing Turkiye’s domestic energy production.

News
January 07, 2025
Trillion Energy has announced the successful installation of 2 3/8” velocity string tubing (VS) into the Alapli-2 natural gas well, marking a significant step in the company's efforts to enhance long-term gas production at the SASB field.
News
January 06, 2025
Varel Energy Solutions (VES) has acquired Ace Well Technology (ACE), an international supplier of oilfield casing, cementing and completion products. The deal will expand VES' smart completions offerings supporting the offshore and premium market sectors.

News
August 14, 2024
Petroleos Mexicanos has reached a deal with an oilfield-services provider to drill in the Gulf of Mexico as the heavily indebted state energy company turns to the private sector to boost crude production.

News
July 22, 2024
The campaign was conducted by the Petrodec HAEVA rig and has delivered sustained production gains of around +5 MMcfd, in line with expectations. The planned scope was completed ahead of schedule and within budget, confirming the technical and commercial success of the project.

News
Emerson to deploy completion monitoring systems for Equinor’s Rosebank oil and gas field offshore UK
June 06, 2024
Emerson’s suite of Roxar downhole monitoring tools will empower Equinor to use advanced oil recovery techniques, optimize reservoir performance and verify well integrity in real time. The Rosebank field is estimated to contain over 300 MMbbl of recoverable oil resources.

News
May 02, 2024
(WO) — The agreement provides a contractual framework for earlier and closer engagement throughout the project cycle to unlock more value from complex projects, and work commences immediately with maturation of the subsea scope for the Wisting and Bay Du Nord projects off Newfoundland and Labrador, Canada.

News
April 15, 2024
The scope of the contract includes SLB’s full bore electric interval control valves and electric subsurface safety valves. The award is a catalyst toward full production system electrification for Petrobras, improving production availability via more reliable completions.

News
March 22, 2024
Optime Subsea's ROCS eliminates the need for both the umbilical, which traditionally connects the surface to the seabed for controlling the tubing hanger in subsea well completions, and the topside hydraulic control unit. This innovation not only cuts costs but also reduces the amount of deck space required for these operations.

News
February 27, 2024
The well completion operation was performed utilizing a Remotely Operated Controls System (ROCS) that has been supplied by Norwegian technology company Optime Subsea.

News
December 04, 2023
(WO) — AGR has secured the well management contract with Apus Energia Guinea-Bissau S.A. for a deepwater exploration well in the Sinapa license offshore Guinea-Bissau, with drilling set to commence in summer 2024.

News
July 14, 2023
The wireless communication system, part of Optime Subsea’s Remotely Operated Controls Systems (ROCS), was successfully tested at the Wintershall Dea-operated Nova field, which is located about 120 kilometres northwest of Bergen, Norway, in 370 metres water depth.

News
June 22, 2023
Two additional gas bearing intervals, 3,561.5 to 3,564.5 meters MD (measured depth) and 3,498.5 to 3,501.5 meters MD, for a total of 6 meters were perforated and put onto production at about 5.3 MMcfd and with a final buildup pressure of 1,794 psi.

News
April 04, 2023
First oil from the well is expected in early April. Commissioning and start-up of the new gas lift compressor will follow the first oil activities on the FPSO.

News
March 25, 2023
BiSN partnered with Aker BP to deploy Wel-lok technology to create safe and cost-efficient Wel-lok plugs. Not only did this provide a permanent plug and abandonment solution, it allowed for new wells to be drilled and operated safely for the next 30 years.

News
February 23, 2023
The agreement includes three Remotely Operated Controls Systems (ROCS) and two wireless electric subsea control and intervention systems (eSCILS), as well as technical service personnel to support operations.

News
December 09, 2022
VAALCO Energy, Inc. provided an operational update including clean-up information on the North Tchibala 2H-ST well and more on Dec. 9.

News
November 08, 2022
Senior executives from the most active majors and independents in the Gulf of Mexico will convene to discuss regional operations and outlook at next week's Deepwater Executive Summit in Houston.
News
November 21, 2019
The increased capability of the XSTMZ system helps increase production and total recovery by driving down abandonment pressure and can save rig time by isolating and treating several intervals with a single trip.


